Problèmes de Cadence

Calculer le temps ou le nombre de travailleurs nécessaires quand le travail total reste constant.

Apprendre

Calculer le temps ou le nombre de travailleurs nécessaires quand le travail total reste constant.

Work rate problems are based on the formula: Work = Rate × Time, or equivalently, Work = Workers × Days. If the total work is constant, increasing workers decreases time proportionally. The key insight is that 'worker-days' (or 'machine-hours') represents the total work, and this stays the same regardless of how many workers do the job.

Total Work = Workers × Time. If W1 × T1 = W2 × T2, then T2 = (W1 × T1) / W2

  • 4 workers in 12 days = 48 worker-days. 6 workers = 48 ÷ 6 = 8 days
  • 3 machines in 10 hours = 30 machine-hours. 5 machines = 30 ÷ 5 = 6 hours
  • 2 people in 15 days = 30 person-days. 5 people = 30 ÷ 5 = 6 days

Comment le reconnaître

  • Problem mentions workers/machines and time to complete a job
  • Asks how long with different number of workers
  • Total work (job size) remains constant

Erreurs fréquentes

  • Thinking more workers means more time (it's inverse)
  • Adding workers instead of multiplying
  • Forgetting that work = workers × time

Résolution étape par étape

5 ouvriers terminent un projet en 12 jours. Combien de jours pour 10 ouvriers ?

  1. Calculez le travail total : 5 ouvriers x 12 jours = 60 jours-ouvrier
  2. Le travail total reste constant à 60 jours-ouvrier
  3. Divisez par le nouveau nombre d'ouvriers : 60 / 10
  4. Calculez : 60 / 10 = 6 jours

Réponse: 6 days