Werbung
← Zurück zu Numerisches Denken · Anleitungen
Arbeitsleistungsprobleme
Zeit oder Arbeiter berechnen, wenn die Gesamtarbeit konstant bleibt.
Lernen
Zeit oder Arbeiter berechnen, wenn die Gesamtarbeit konstant bleibt.
Work rate problems are based on the formula: Work = Rate × Time, or equivalently, Work = Workers × Days. If the total work is constant, increasing workers decreases time proportionally. The key insight is that 'worker-days' (or 'machine-hours') represents the total work, and this stays the same regardless of how many workers do the job.
Total Work = Workers × Time. If W1 × T1 = W2 × T2, then T2 = (W1 × T1) / W2
- 4 workers in 12 days = 48 worker-days. 6 workers = 48 ÷ 6 = 8 days
- 3 machines in 10 hours = 30 machine-hours. 5 machines = 30 ÷ 5 = 6 hours
- 2 people in 15 days = 30 person-days. 5 people = 30 ÷ 5 = 6 days
So erkennen Sie es
- Problem mentions workers/machines and time to complete a job
- Asks how long with different number of workers
- Total work (job size) remains constant
Häufige Fehler
- Thinking more workers means more time (it's inverse)
- Adding workers instead of multiplying
- Forgetting that work = workers × time
Schritt-für-Schritt-Lösung
5 Arbeiter schaffen ein Projekt in 12 Tagen. Wie viele Tage brauchen 10 Arbeiter?
- Berechne die Gesamtarbeit: 5 Arbeiter x 12 Tage = 60 Arbeitertage
- Die Gesamtarbeit bleibt bei 60 Arbeitertagen konstant
- Teile durch die neue Arbeiterzahl: 60 / 10
- Berechne: 60 / 10 = 6 Tage
Antwort: 6 days
Übungshinweise
Werbung